
Coal was mined from Mostyn during the reign of Edward I when boats regularly took coal and other materials from here to Conwy, Caernarfon and Beaumaris.
Until the railway opened in 1848 water transport was vital as pack horses could only carry limited loads.
Mining methods changed little in 100 years. Mining by hand meant the coal was brought out in large lumps, ideal for both domestic heating and industry such as steam engines but as demand changed mining methods changed and coal faces increased from 12 feet wide to over 100 yards long.
When Connah’s Quay Power Station opened in 1954 it needed much smaller pieces of coal or slack. Around 10,000 tonnes of coal were delivered each week, mainly by rail into sidings that led to the coal wagon tippler plants.
The coal-fired power station closed in 1984 and has been replaced by a gas-fired station, powered by gas processed at Point of Ayr.