North East Wales Trails

Gas Processing

Gas Processing

Natural gas is piped from Liverpool Bay to Point of Ayr Terminal to be sweetened before being sent to the power station at Connah’s Quay.

Oil and gas were formed millions of years ago by decaying plants and animals when this area was a huge swamp. The reserves are trapped under a layer of mudstone around 1000 metres below the sea bed. Oil is processed and stored off shore but the gas is piped to Point of Ayr terminal via a 33.5km pipeline under the sea.

Here any dust is removed together with sulphur to produce ‘sweet’ gas which is then transported 27km to Connah’s Quay power station at a rate of 12.5 million cubic feet per hour. The power station produces 1,400 megawatts of electricity, enough for 1,400,000 people.